What happened
Construction Enquirer, Building and The Construction Index reported this week that Willmott Dixon Interiors has won planning permission for an £80m retrofit of London Fire Brigade's former headquarters at 8 Albert Embankment, a Grade II-listed Art Deco building. The scheme will revive six floors of office space that have stood vacant above Lambeth fire station since the Brigade moved its HQ to leased premises in Southwark in 2008.
The work covers a full renewal of mechanical, electrical and public health systems, new life safety installations, replacement windows, re-roofing and recladding of the 1980s CMC extension, alongside new lifts, partitions, ceilings and finishes. The building's original Art Deco frontage and other historic features will be restored, and a new publicly accessible heritage and learning space will be created around the Memorial Hall, which commemorates firefighters who have died in service. The scheme includes SME engagement, job creation and an on-site construction skills academy.
Around 840 staff are expected to return once the building reopens. Lambeth fire station's ground and second floors will temporarily close during the works, with crews relocating to Clapham and Chelsea stations. Construction is due to start in mid-2027, with completion targeted for 2029.
Why it matters
This is a large, publicly funded heritage retrofit for an emergency services client, not the office-to-resi conversions or hospital rebuilds that have dominated recent headlines. It shows a public sector landlord choosing to restore and reoccupy a historic asset rather than relocate permanently, and doing so at a scale, £80m, that puts heritage conservation skills alongside heavy M&E replacement on the same job. For a contractor, winning work like this on a listed 1937 building is a different proposition from a standard fit-out, and planning approval means the pipeline is now real rather than speculative.
What it means for careers and hiring
The skillset this project needs is specific: conservation-accredited project managers and site managers who can work within listed-building constraints, M&E engineers comfortable retrofitting modern systems into a 1930s structure without compromising its fabric, and commercial managers who have handled the cost volatility that comes with opening up a historic building mid-scheme. London-based professionals with listed-building or heritage retrofit experience on their CV are well placed as Willmott Dixon Interiors mobilises ahead of the mid-2027 start.
The confirmed on-site construction skills academy is also worth noting for anyone earlier in their career. These academy set-ups on major London schemes typically open routes for apprentices and career-changers into trades and junior site roles well before the main contract workforce peaks, so it is worth watching for recruitment activity from Willmott Dixon Interiors over the next six months, well ahead of the 2027 start on site.

Comments