UK Fusion Energy, part of the UK Atomic Energy Authority, has opened a procurement worth up to £115m for five engineering contracts to help build the STEP fusion prototype at West Burton in Nottinghamshire, Construction News reported on 12 November. The tender, published through the Find a Tender Service on 11 November, covers design, integration, testing and control of key plant systems.
The five lots cover operating test facilities (£35m, the largest), systems engineering and integration (£25m), two breeder blanket and fuel cycle packages (£20m each), and control systems (£15m). Each lot will go to a single supplier, though one firm can win up to three of the five. The initial term runs two years, with options to extend to March 2031. Bidders must sign non-disclosure agreements to see the full tender documents. Construction News reports a bid deadline of 29 January, with award decisions expected on 6 April and contracts starting in April.
The procurement follows the appointment in March of the Kier and Nuvia-led Ilios consortium as construction partner at West Burton under a separate £200m contract.
Why it matters
STEP, the Spherical Tokamak for Energy Production, is the UK's attempt to build a prototype fusion power plant by the early 2030s on the site of a former coal power station. It is a genuinely new build type for the UK construction and engineering sector: nothing quite like it has been built before, which means the supply chain is still forming rather than already settled around a handful of incumbents.
That makes this tender worth watching even for firms with no fusion experience. The lots sit close enough to conventional nuclear, process engineering and specialist M&E work that contractors and consultants already serving Hinkley Point C and Sizewell C are well placed to bid, and West Burton's position in Nottinghamshire puts it within reach of the existing East Midlands and Yorkshire engineering workforce rather than requiring a wholesale relocation to Somerset or Suffolk.
What it means for your career
If you are a systems engineer, controls specialist or senior project manager with nuclear, oil and gas, or process plant experience, STEP is a route into a sector that will need people faster than it can train them from scratch. The Ilios consortium's main contract is already under way, and this latest tender signals the civils and services supply chain beneath it is about to widen.
For contractors and specialist subcontractors in the East Midlands, this is a chance to get in early on a programme that is likely to run for well over a decade, rather than competing for a slice of an already crowded Hinkley or Sizewell supply chain. Commercial and estimating staff with experience bidding for first-of-a-kind government-backed programmes will be particularly sought after, since UK Fusion Energy's procurement route, built around NDAs and tightly scoped lots, is closer to defence and nuclear new build than it is to conventional civils tendering.

Comments